
We design and install safe and efficient electrical systems, and ducted or split air conditioning systems for your home or office in Marbella, Estepona, Fuengirola and all Costa del Sol. Includes installation certificates, LED light points, reinforced sockets, home automation and silent climate control. 15+ years experience.
Immediate attention! Free call and no-obligation quote within 24h
We carry out electrical and air conditioning installation in Marbella and the Costa del Sol, for homes and offices. A complete electrical installation in a medium-sized apartment can take 2 to 5 working days. Ducted air conditioning serves the whole home, while split units suit one room or zone. An electrical certificate is mandatory after major electrical work.
Our service combines two fundamental aspects of modern comfort: safe and efficient electricity, and climate control. Whether for a renovation, new construction or a spot upgrade, we guarantee quality installations that comply with current regulations.
Includes design and installation of new electrical panels, complete wiring (multilayer, copper), LED light points, reinforced sockets for appliances, installation of home automation systems and official electrical installation certificate (Electrical Certificate).
We offer ducted air conditioning systems (ducted air) to climate-control the entire home or individual splits for specific zones. Includes indoor and outdoor units, pipe and cable installation, and commissioning with certified refrigerant gases.
We design the installations jointly to optimize space, conceal pipes and cables, and guarantee maximum energy performance. We work with equipment from leading brands such as Daikin, Mitsubishi, LG or Samsung.
We explain how we carry out electrical and air conditioning installations from start to final delivery.
We carry out a preliminary study of your needs and the space. We design the electrical plan with the location of light points, sockets and panel, and the air conditioning circuit (ducts, grilles, outdoor unit).
We prepare the passage areas, make the necessary grooves in walls or false ceilings, and install the conduits for electrical cables and refrigerant pipes for the air conditioning.
We install the electrical panel, pull and connect the cables, install light points and sockets. Subsequently, we mount the indoor and outdoor air conditioning units and connect the copper pipes and control cables.
We perform the refrigerant gas charge, test all electrical and air conditioning circuits. We issue the official electrical installation certificate if required.
We perform a final cleaning of the work area, remove debris and deliver the functional installations, along with the user manual for the equipment.
We inform you about the necessary procedures and how we handle everything for you.
For electrical or air conditioning installations in a renovation (minor work), a major building permit is generally not required, but a (prior notice) to the town hall may be necessary if existing installations are altered. We manage everything.
(Major work) involves altering the building's structure (foundations, slabs, load-bearing walls) or changing the layout. (Minor work) includes specific renovations such as bathrooms, kitchens, painting or changing installations without touching the structure).
Yes, (we offer the electrical installation certificate) (Electrical Certificate) issued by an authorized installer. It is mandatory to activate a new supply or significantly modify an existing installation.
Illustrative images of this type of work: they do not show specific projects.
Example of electrical work during a full renovation
Illustrative image
Example of services in an open-plan space under renovation
Illustrative image"We rewired the whole house and added ducted air conditioning. The breaker doesn't trip anymore like it used to."
"We needed the electrical certificate to sell the property and had it sorted in under two weeks."
We resolve the most common doubts about electrical and air conditioning installations. If you have any specific questions, don't hesitate to contact us!
It depends on the size and complexity, but a complete installation in a medium-sized apartment can take between 2 and 5 working days. We always provide you with a detailed schedule.
Ducted air conditioning quietly and evenly cools the whole home. Split is ideal for a specific room or zone. The choice depends on your needs, budget and home layout.
Yes, it is mandatory if a major renovation of the electrical installation is carried out or if a new supply is activated. It is a legal document certifying that the installation is safe and complies with regulations.
Yes, we offer preventive maintenance contracts for electrical installations and air conditioning systems, to guarantee their good operation and extend their lifespan.
Yes, we integrate home automation systems to control lighting, blinds, climate control and sockets via mobile or voice. We work with brands like SmartThings, Google Nest or Alexa.
We offer a detailed, no-obligation, FREE quote for your electrical installation or air conditioning system in Marbella, Estepona, Fuengirola and all Costa del Sol. Includes design, materials, labor, timelines and permit management.