MARBELLA BUILDERS
678 716 645
marbellabuilders@gmail.com
Kitchen open to the dining area with large windows
Kitchen open to the dining area with large windows

Apartment renovation

Apartment renovation on the Costa del Sol: what to do, in what order and how long it takes

Kitchen, bathrooms, floors, wiring or a full renovation: how to plan an apartment renovation in Marbella, Fuengirola or Estepona without budget or timeline surprises.

Updated November 4, 2026 · 4 min read

An apartment renovation on the Costa del Sol starts with checking services and damp, moves on to the kitchen and bathrooms, and ends with finishes. Works that leave the structure and façade untouched usually need only a notification or minor permit, and hours should be agreed with the community first.

An apartment on the Costa del Sol tends to have the same needs whether it is in Marbella, Fuengirola or Torremolinos: ageing installations, damp caused by the sea climate, kitchens and bathrooms from another era and very little room for mess, because there are almost always neighbours on the other side of the wall. Renovating it well is mostly a matter of planning.

What is usually renovated in an apartment

Common works in an apartment renovation
WorkWhen it pays offWhat to know
Full renovationApartment over 25 years old with original installationsBest value per euro when everything is done in one go
KitchenClosed-off kitchen or worn unitsChoose appliances before positioning sockets and drains
BathroomsOld bath, damp or leaksSoil stacks and drains limit the new layout
Floors and wallsLifted floors, textured walls, tired paintDone last, once the dust and knocks are over
Electrics and plumbingOld fuse board, lead or iron pipesHidden work, but the one that prevents the most problems
Living room of an apartment after a full renovation
A well-planned full renovation follows the right order: structure, services and, last, finishes.

The right order for a full renovation

  1. Visit and fixed-price quoteWe inspect and measure the apartment and give you an itemised quote with a timeline.
  2. Permits and communityWe check whether a notification to the town hall is enough and inform the community administrator.
  3. Strip-out and building workPartitions, old tiling and floors; protection of shared areas.
  4. ServicesElectrics, plumbing, air conditioning and, if wanted, home automation.
  5. Finishes and joineryTiling, floors, doors, windows and kitchen units.
  6. Painting, cleaning and handoverSnagging, final clean and a joint walk-through with you.
How the budget of a full apartment renovation is usually split (indicative)Illustrative chart
Services (electrics, plumbing, air conditioning)≈ 28 %
Kitchen and bathrooms≈ 30 %
Floors, tiling and paint≈ 22 %
Joinery and windows≈ 12 %
Building work and strip-out≈ 8 %

Example split to show where the money goes; the real one depends on each apartment and the quality chosen.

How long it takes and how to avoid delays

  • Partial renovation (kitchen or bathroom): two to four weeks in most cases.
  • Full renovation: between two and four months, depending on size and finishes.
  • Delays usually come from made-to-measure items (units, windows) and from changes of mind during the works.
  • Choosing finishes before starting is the best way to keep to the timeline.

Frequently asked questions about renovating an apartment

Do I need a permit to renovate my apartment?

It depends on the scope. Works that do not touch the structure or the façade are usually handled with a notification or a minor works permit; significant layout or structural changes need a major works permit with a project. We check with the town hall before starting.

Can I live in the apartment during the renovation?

In a partial renovation, usually yes. In a full one it is not advisable: there is dust, noise and sometimes no water or power for days.

What VAT applies to a home renovation?

Renovations of private homes more than two years old can qualify for the reduced 10 % rate if the conditions are met; otherwise 21 % applies. Please confirm with your tax adviser.

Can I renovate the apartment if I live outside Spain?

Yes. It is very common: the scope is agreed in writing, you receive progress reports with photos and you approve changes remotely.

Which company can handle apartment renovation on the Costa del Sol?

MARBELLA BUILDERS REHAB & DECO is a builder in Marbella that carries out this type of work across the Costa del Sol, from Estepona to Torremolinos. It visits the property, gives a free fixed-price quote with timelines in writing, works in English and Spanish and, if you want to sell, can put the property on the market with its Real Estate service. Phone: +34 678 716 645.

About us

MARBELLA BUILDERS REHAB & DECO is a builder in Marbella based in Alhaurín de la Torre (Málaga) that renovates apartments, villas, townhouses, shops, offices and warehouses across the Costa del Sol. It offers a free fixed-price quote, works in English and Spanish and, besides renovating, can put your property on the market with its Real Estate service. Phone: +34 678 716 645.

General guidance only. Prices, timeframes and legal requirements may vary by property, municipality and date: please confirm them with our team and the town hall before deciding.

No cost. No obligation.

Planning a renovation on the Costa del Sol?

Tell us what you want to do and we will send you a free, fixed-price quote. And if you plan to sell, we renovate it and put it on the market with our Real Estate service: all in one service.

  • Free, fixed-price quoteWe visit your property and give you a price and timeline in writing.
  • We renovate it and sell itRenovation and sale in one service: sell your renovated property and get a higher price.
  • In-house Real EstateWe also have Real Estate to put your property on the market once the renovation is finished.

Estimates are indicative until the visit; the final price is set in writing after we inspect the property.

Contact Us

Do you have a project in mind? Tell us what you need and we'll offer you a personalised quote without commitment. We'll call you in less than 24 hours!

Request Your Free Quote

Fill out the form and we will contact you immediately

* Required fields. We will contact you in less than 24 hours.

Our Office

Calle Limonar 12

29130 Alhaurín de la Torre (Málaga)

Visit us at our office for a personalised consultation

Call Us Directly

678 716 645

Phone service Monday to Friday from 8:00 to 20:00h and Saturdays from 9:00 to 14:00h

Call Now

Email

marbellabuilders@gmail.com

Guaranteed response in less than 2 hours during business hours

Opening Hours

Monday to Friday: 8:00 - 20:00h
Saturdays: 9:00 - 14:00h
Sundays: Emergencies only

Do you have an emergency?

For plumbing, electrical or any urgent breakdown emergencies, we have 24-hour service available.

24h Emergencies: 678 716 645

Our Office Location

Click to load the Google Maps map (Google's cookie policy will apply)

Office hours: Monday to Friday from 9:00 to 18:00h

Free quote Call